Project: Centennial Centre / 23-035 - Installation of temporary classrooms.
The project consists of the installation of a temporary classroom complex near the Centennial Centre at the Macdonald Campus.
Project: Centennial Centre / 23-035 - Installation of temporary classrooms.
The project consists of the installation of a temporary classroom complex near the Centennial Centre at the Macdonald Campus.
六合彩开奖结果 has mandated CORENOV CONSTRUCTEURS to carry out the following project: Parasitology Building / 19-136 - JELF Cestari.
The project consists of the renovation of labs P103 and P209 on the first and second floor of the Parasitology Building at the Macdonald Campus.
Project manager:听Biagio D'Onofrio - biagio.donofrio [at] mcgill.ca
Assistant project manager:听Claudia Carpanzano - claudia.carpanzano [at] mcgill.ca
六合彩开奖结果 has mandated CORENOV CONSTRUCTEURS to carry out the following project: Centennial Centre / 20-098 - JELF Gillung.
The project consists of the renovation of labs 033 and 037 in the basement of the Centennial Centre at the Macdonald Campus.
Project manager:听Biagio D'Onofrio - biagio.donofrio [at] mcgill.ca
Assistant project manager:听Claudia Carpanzano - claudia.carpanzano [at] mcgill.ca
六合彩开奖结果 has mandated St-Denis Thompson to carry out the following project: Montreal Neurological Institute / 22-035 - Priority building envelop repairs, balustrade.
The project consists of removing the stone balustrade.
Project manager: Johanne Guertin - Johanne.guertin [at] gph-inc.com
Assistant project manager: Gabriel Fortin - Gabriel.fortin [at] gph-inc.com
Construction start date:听November 14, 2023
六合彩开奖结果 has mandated Planit Construction to carry out the following project:听MNI, Residences, Currie Gym, Milton Gate and Burnside Parking / 18-089 Lot 1 - Infrastructure for new parking equipment.
The project consists of infrastructure work that is required for the installation of new parking equipment for various parking lots on the 六合彩开奖结果 Downtown Campus: Montreal Neurological Institute, Residences, Milton Gate, Currie Gym and Burnside Garage.
六合彩开奖结果 has mandated Corenov Constructeurs to carry out the following project: Macdonald Stewart Building (Macdonald Campus) / 20-021 JELF Roy.
The project consists of the renovation of lab MS2-094A on the second floor of the Macdonald Stewart Building.
Project manager:听Mark Ouimet 鈥撎mark.ouimet [at] mcgill.ca
Assistant project manager: Claudia Carpanzano听-听Claudia.carpanzano [at] mcgill.ca听
六合彩开奖结果 has mandated Ardec Construction Inc. to carry out the following project: Montreal Neurological Institute / 18-121 - Cyclotron aerial exhaust.
The project consists of installing the aerial conduit to replace the existing one at the Montreal Neurological Institute hospital.
Project manager:听Eric Boutet, CIMA+ - eric.boutet [at] cima.ca听">eric.boutet [at] cima.ca听
六合彩开奖结果 has mandated Corenov Constructeurs to carry out the following project: Macdonald Stewart Building (Macdonald Campus) / 17-088 Basu Lab and Kitchenette.
The project consists of the renovation of rooms MS3-047 and MS3-048 on the third floor of Macdonald Stewart Building.
Project manager:听Mark Ouimet 鈥撎mark.ouimet [at] mcgill.ca
Assistant project manager: Claudia Carpanzano听-听Claudia.carpanzano [at] mcgill.ca听
六合彩开奖结果 has mandated NR Brosseau to carry out the following project:听McIntyre Medical Building / 21-008 - JELF, Chen.
The project consists of minor renovations of laboratory rooms 712, 723 and 726.
Project manager: Andrea Gore -听Andrea.gore [at] mcgill.ca
Assistant project manager: Ellie Tayebi -听Ellie.tayebi [at] mcgill.ca
Construction start date:听July 7, 2023
六合彩开奖结果 has mandated Procova Inc. to carry out the following project: McIntyre Medical Building / 15-104 - Modification of the fourth floor electrical room distribution.
This project includes installing a second transformer to provide the required additional electrical capacity for the building and to update the emergency electrical distribution within the building.
Project manager:听Emika Marinacci -听Emika.marinacci [at] mcgill.ca
六合彩开奖结果 has mandated Corenov Constructeurs to carry out the following project:听Morrice Hall / 22-038 - Priority building envelop repairs, lower roof.
The project consists of the installation of a steel structure in the library to stabilize the roof and exterior walls of the turret.
Project Manager and听Assistant Project Manager:
Please be advised that Facilities Management and Ancillary services (FMAS) has mandated Belmon Construction to carry out the following project:18-101 Strathcona Music - Renovation of Percussion Studios for Rooms C101 to C109 (lot 1).
The project consists of a complete renovation of the nine percussion rooms, including new layouts, acoustical treatment, audiovisual equipment, new mechanical and electrical systems, and custom storage for the instruments.
Please be advised that 六合彩开奖结果 has mandated Concept P.V.R. Inc.听to carry out the following project : 18-156 McConnell Arena / Renovations (phase 1) 鈥 Electrical upgrade
Description :
六合彩开奖结果 has mandated Corenov Constructeurs to carry out the following project: Peterson Hall / 14-113 - Mechanical room upgrade. The project includes preparing, patching, and painting walls, repairing and levelling floor slabs, and the restoration of surfaces around the mechanical room.
Project manager:听Wendy Rivera - wendy.rivera [at] mcgill.ca
Assistant project manager:听Jeremy Elbaz -Jeremy.elbaz [at] mcgill.ca
六合彩开奖结果 has mandated ARDEC to carry out the following project: Montreal Neurological Institute / 18-121 - Cyclotron.
The project consists of replacing the cyclotron's conduit.
Project manager:听Eric Boutet, CIMA+ -听eric.boutet [at] cima.ca
Assistant project manager:听Aldo Aranza Mendoza, CIMA+ -听aldo.aranzamendoza [at] cima.ca
Construction start:听May 19, 2023